CHARACTERISTICS OF BLAST FURNACES SUPPLIED BY MEPC: 1. Bell Less Top 2. Pulverized Coal Injection (PCI) 3. Top Fired Stove with Double Pre-heating System in supply of hot blast upto 1250℃ 4. Dry Type Gas Cleaning Plant, offering more advantages over wet type gas cleaning 5. Top Pressure Recovery Turbine for power generation 6. Stave cooler with ceramic-cup & carbon blocks forming thin BF wall 7. Closed Circuit Soft Water Circulation 8. Screw Conveyor Type Slag Granulation Plant 9. High automation level and proper monitoring system
MoreLess
Product category: Sintering plants
SINTER PLANT
1. Annular sinter plant: Suitable for Blast Furnace with capacity less than 400m3 2. Winch driven sinter plant: Suitable for Blast Furnace with capacity between 400-1000m3 3. Linear sinter plant (36m2-500m2): Suitable for Blast Furnace with capacity more than 400m3
MoreLess
Product category: Blast furnace plants
PULVERIZED COAL INJECTION (PCI)
The PCI is one of the major measures to considerably reduce the coke ratio and improve indirect reduction. The substitution with cheaper coal for expensive coke can lower the cost of hot metal making. For these reasons, MEPC Group, in cooperation with research and technical partners, has developed PCI technology and places great emphasis on transfer and application of this technology, being China's first export of the PCI technologies and equipment, and later transfer of PCI technologies for blast furnace ranging from 320m3 to 4064m3.
MoreLess
About us
Company portrait
China Metallurgical Engineering & Project Corporation (MEPC) is a diversified Engineering and Project Group Corporation with vertical portfolios in Metallurgy, Mining, Coal & Coking, Energy and Non-Ferrous Metal, etc.. MEPCs principal activities are in proven technology, engineering, consultancy, supply, project contracting as well as financial